head_banner

MST1500 Front Idler for Morooka rental Morooka Crawler Tracked dumper Truck for sale

Short Description:

Yijiang’s front idlers are suitable for MST1500 MOROOKA crawler dump trucks. They are high-quality and durable, well-made, pay attention to details, and can withstand the harsh test of heavy use in harsh working environments, which can improve the performance and service life of the equipment


Product Detail

Product Tags

Product Details

Crawler tracked dumper series of rollers can be very different from machine model to another model, some rollers can be used on several machine models. And the model will change with each generation. To avoid confusion, you need to have the tracked dumper model and serial number ready, we confirm the drawings together to ensure that the products produced are correct.
In the process of production and sales, we won't be a competitive market with low quality and low prices, we insist on the policy of quality first and good service, create optimum value for customers is our constant pursuit.

Quick Details

Condition: 100% New
Applicable Industries: Crawler tracked dumper
Hardness Depth: 5-12mm
Place of Origin Jiangsu, China
Brand Name YIKANG
Warranty:   1 Year or 1000 Hours
Surface Hardness HRC52-58
Color Black
Supply Type OEM/ODM Custom Service
Material 35MnB
MOQ 1
Price: Negotiation
Process forging

Advantages

YIKANG company manufacture crawler tracked dumper undercarriage parts for MST dumpers including rubber tracks, top rollers,  track rollers or sprockets and  front idlers.

84a5deac17b6842c555f3a810875cfd

Product Specification

 

Track roller MST300/600/700/800/1500/2000/2200/2200VD
Sprocket MST300/800/1500V/1500VD/2200/2200VD
Front idler MST300/600/800/1500/2200/
Top roller MST300/800/1500/2200

 

 

 

Application Scenarios

MST front idler can be applied to crawler tracked dumper, such as MST300, MST600, MST800, MST1500, MST2200..

Packaging & Delivery

YIKANG front idler packing:  Standard wooden pallet or wooden case.
Port :  Shanghai or Customer requirements.
Mode of Transportation: ocean shipping, air freight, land transportation.
If you finish the payment today, your order will ship out within the delivery date.

Quantity(sets) 1 - 1 2 - 100 >100
Est. Time(days) 20 30 To be negotiated

One- Stop Solution

MST800 front idler for crawler tracked dumper (4)

Our company has a complete product category which means you can find everything you need here. Such as rubber track undercarriage, steel track undercarriage, track roller、top roller、front idler、sprocket、rubber track pads or steel track etc.
With the competitive prices we offer, Your pursuit is sure to be a time-saving and economic one.


  • Previous:
  • Next:

  • Write your message here and send it to us