Short Lead Time for Crawler Rubber Track Platform - Custom rubber track undercarriage for carrying 1-15 ton crawler excavator drilling rig – YIJIANG
Short Lead Time for Crawler Rubber Track Platform - Custom rubber track undercarriage for carrying 1-15 ton crawler excavator drilling rig – YIJIANG Detail:
Product Details
The crawler undercarriage is the second most widely used walking system after tire type in construction machinery. Commonly used are: mobile crushing and screening machines, drilling rigs, excavators, paving machines, etc.
Good possibility. The crawler undercarriage adopts crawler, the grounding length can reach 4m to 6m, the grounding area is large, and the grounding specific pressure is small; and there are generally thorns on the crawler board, which has strong gripping ability and can maneuver in grassland, desert, jungle, and swamp environments; The Idler position is high and can pass obstacles such as trenches, vertical walls, etc
Condition: | New |
Applicable Industries: | Crawler Machinery |
Video outgoing-inspection: | Provided |
Place of Origin | Jiangsu, China |
Brand Name | YIKANG |
Warranty: | 1 Year or 1000 Hours |
Certification | ISO9001:2019 |
Load Capacity | 1 –15Tons |
Travelling Speed (Km/h) | 0-2.5 |
Undercarriage Dimensions(L*W*H)(mm) | 2250x300x535 |
Color | Black or Custom Color |
Supply Type | OEM/ODM Custom Service |
Material | Steel |
MOQ | 1 |
Price: | Negotiation |
Standard Specification / Chassis Parameters
Type |
Parameters(mm) |
Track Varieties |
Bearing(Kg) |
||||
A(length) |
B(center distance) |
C(total width) |
D(width of track) |
E (height) |
|||
SJ080 | 1240 | 940 | 900 | 180 | 300 | rubber track | 800 |
SJ050 | 1200 | 900 | 900 | 150 | 300 | rubber track | 500 |
SJ100 | 1380 | 1080 | 1000 | 180 | 320 | rubber track | 1000 |
SJ150 | 1550 | 1240 | 1000 | 200 | 350 | rubber track | 1300-1500 |
SJ200 | 1850 | 1490 | 1300 | 250 | 400 | rubber track | 1500-2000 |
SJ250 | 1930 | 1570 | 1300 | 250 | 450 | rubber track | 2000-2500 |
SJ300A | 2030 | 1500 | 1600 | 300 | 480 | rubber track | 3000-4000 |
SJ400A | 2166 | 1636 | 1750 | 300 | 520 | rubber track | 4000-5000 |
SJ500A | 2250 | 1720 | 1800 | 300 | 535 | rubber track | 5000-6000 |
SJ700A | 2812 | 2282 | 1850 | 350 | 580 | rubber track | 6000-7000 |
SJ800A | 2880 | 2350 | 1850 | 400 | 580 | rubber track | 7000-8000 |
SJ1000A | 3500 | 3202 | 2200 | 400 | 650 | rubber track | 9000-10000 |
SJ1500A | 3800 | 3802 | 2200 | 500 | 700 | rubber track | 13000-15000 |
Application Scenarios
Packaging & Delivery
One- Stop Solution
Product detail pictures:
Related Product Guide:
It truly is a great way to improve our merchandise and repair. Our mission should be to create imaginative products to prospects with a excellent knowledge for Short Lead Time for Crawler Rubber Track Platform - Custom rubber track undercarriage for carrying 1-15 ton crawler excavator drilling rig – YIJIANG , The product will supply to all over the world, such as: Oman, Bangladesh, Cancun, Actually need to any of those objects be of interest to you, make sure you allow us to know. We'll be delighted to present you a quotation on receipt of one's comprehensive specs. We've our individual specialist R&D enginners to meet any of the requriements, We look forward to receiving your enquires soon and hope to have the chance to work together with you inside the future. Welcome to take a look at our organization.
By Sophia from UK - 2018.09.08 17:09
Hope that the company could stick to the enterprise spirit of Quality, Efficiency, Innovation and Integrity, it will be better and better in the future.
By Adela from Namibia - 2017.03.28 12:22